mould
Contrl Flow
Control document
 

Customers¡¯ satisfaction is our exclusive target. We concentrate on every small detail which may result in customers¡¯ un-satisfaction and thus complain. So, Quolity control is very important,

 Our Quality Control Department using some control machine to control and tracking each elements, Included CMM£¬micrometer, vernier caliper, gauge block£¬pin gauge, height gauge as well as tool microscopes,etc¡­

 We proceed the quality control in every process. When finish one action, we must do the control before the Next action,

With below control documents:
1£®  Steel Certification afford by Mouldbase company;
2£®  Mould steel hardness report;
3£®  All elements dimension check before Next action;
4£®  EDM electrodes dimension report;
5£®  Mould cavity and core dimension report;
6£®  Mould complete dimension check before or Assembly;
7£®  Mould trial report and Sample control report;
8£®  Mould final check before shipement;

 
 
 
Copyright 2006-2010 ART Mould  Limited. All rights reserved.
Add. ZhongTai Industrial Park,Sili Rd.Fumin Community, Guanlan,Shenzhen,China
Tel: 86 755 8484 1991, Fax:+86 755 8973 2101
Web:http://www.art-mould.com   E-mail:sales@art-mould.com